Project 07 -
Rockhampton Relocation, Stage 1
Client: APA Group
Location: Rockhampton
Services: Gas - Trenching/Excavation
Project included:
-
Relocation of Steel and PE network comprising approximately 815m of DN100 API 5L X52 PSL2
-
Open trench road crossings, HDD crossings, Open excavation and lay, night works
-
New DRS and associated connecting pipework and abandonment of the existing DRS
-
Approximately 165m of DN160HDPE for connection between DRS and existing HDPE main
-
Approximately 301m of DN110HDPE constructed to relocate the existing main
-
DN200HDPE sleeve and pullback of the DN110HDPE.