top of page
Project 02 -
SMW Clyde Station - DN350 Lay
Client: Jemena/Zinfra
Location: Clyde, Sydney
Services: Gas, Trenching
Installation of DN350ST high-pressure gas main via trench and lay. The project consisted of installing 6 tees and constructing two bypasses and one permanent main through the utility corridor. The length of the pipe network is approximately 750m installed.
Share
bottom of page