Project 10 -
WestConnex Rozelle Interchange Stage 3B

Client: CPBJHJV (CPB John Holland Joint Venture)

Location: Victoria Rd, Rozelle

Services: Laser Guided, Auger Boring, Pipe Jacking, Multi Services (Telstra, Gas, Water, Power)

Project included:

  • 9 under bores ranging in size from 400mm – 900mm, 8 of which were beneath the City Westlink leading on to the ANZAC bridge, one underneath Victoria Street

  • Bores were completed using our guided boring machine in Sydney sandstone conditions

  • Bores slip lined with RCJP ranging from 375mm – 750mm, loaded with services, then grouted before final restoration works were completed

  • Day and Night works.