Resources

Green Line

 

Codmah's staff is considered to be its most valuable and important resource and to promote this relationship our staff are continually encouraged to provide feedback so that the business can continually improve. In turn Codmah utilizes a comprehensive internal skills data base to ensure that all staff meet the required regulatory and or industry specific qualifications. To this end scheduled training is carried out at the required intervals to either refresh existing or introduce new qualifications.

 

Codmah is equipped with an extensive range of light, medium and or heavy plant that can be applied to each project based upon the specific requirements of construction. All operators of plant are properly trained and assessed prior to being authorised for active work-site operations. 

 

Codmah can provide both an environmentally responsible and cost effective method of re-cycling drilling muds with the use of our GPM Mud System. This system has the capacity to handle a throughput of 500 gallon per minute with an integral charge pump to supply clean mud back to the drilling rig. The discharge from the cleaner is virtually dry, dramatically reducing disposal costs.

 

Furthermore Codmah's modern fleet of plant is continually serviced by a dedicated team that operates with the aid of an internal electronic maintenance program allowing scheduled servicing to occur with no interruption to a construction schedule. Unscheduled faults and failures are handled as quickly and efficiently as possible to reduce potential plant downtime.

 

Resources

 

Spacer Image

© 2011 Codmah - All Rights Reserved

Powered by SES Global