Railcorp – Wilcon – Electrical |
![]() Sub contracted by Rightline July 2013 |
50mts of case bore pipe jack boring at 750mm of reinforced concrete pipe under the Heathcote rail Line operated by Rail Corp. The Bore was completed in a 5m deep pit, and soil ground conditions. The bore was completed on time during possession. |