Marayong Railway Station

Rail Infrastructure Corporation - July 2001

Construction of a 350mm diameter steel casing by HDD methods to house electrical conduit that were required to be re-directed for works during the Marayong Station upgrade. A 10mx3m drill pit at a depth of 3.5m was required due to the steep nature of the existing surface levels. 40 metres of open cut trenching was also required to connect the existing power supply.

 

  