Gungahlin to Amaroo Capacity Development Project

Jemena: 2014

  • Installation, testing and commissioning of 2700 meters of DN150 High Pressure Steel Gas Pipeline, ACT;
  • Included, open cut trenching, horizontal directional drilling, creek crossings, cathodic protection system, installation of Hot Tap Fittings, valves & MIJ’s’
  • Installation, testing and commissioning of a 150NB Williamson Tee and a 150NB Ball valve to tie-in to the existing secondary main;
  • Installation, testing and commissioning of 1 off 100NB Ball valves, including installation of a 150NB insulation Joint on the inlet and 1 off 100NB Ball Valve on the outlet of the Black Box;
  • Installation, testing and commissioning of a 7000 cub/m/Hr Black Box;
  • Installation, testing and commissioning of 635m of 150NB Line Pipe with Rock Jacket Coating.



 

  