Cowan Town |
![]() PSP Alliance April-August 2013 |
This project involved the installation of approximately 4.7km of PE sewer mains in sizes ranging from 50mm to 160mm and the connection of approximately 220 properties. 95% of the pipe was installed by 24x40 and 36x50 HDD rigs. |