Birrong to Campbelltown line Duplication

3A Rail – Arenco – Oct 2011

Trenchless excavation:

5 x 125mm PE Electrical Conduits Culvert crossing 50m,

5 x 125mm PE Comms Conduits Culvert crossing 50m,

5 x 125mm PE Electrical Conduits under over pass 90m,

5 x 125mm PE Comms Conduits under over pass 90m.

The directional drill was use to avoid disturbing the integrity of the culvert and also beneath the over pass because of the limited space and head room for open excavation.

 

  