Bargo Town

PSP Alliance: August 2013 – March 2014

This project involved the installation of approximately 17km of PE sewer mains in sizes ranging from 50mm to 180mm and the connection of approximately 818 properties. 95% of the pipe was installed by 24x40 and 36x50 HDD rigs. The rest by means of trenching with excavators. All of the Retic mains are installed and properties have been connected. 

 

  