ACT DN250 High Pressure Steel Gas Pipeline

Alinta - June to September 2006

Construct 4.7 kilometres of DN250 Steel Gas Main to reinforce the existing Gungahlin Gas Distribution System along the side of two arterial roadways and two major cycleway crossings.

 

  