Wakehurst Parkway Capacity Development Project
Location: Wakehurst Parkway (Between Frenchs Forest & North Narrabeen)
Purpose: Construct a new 250mm SDR9 PE Secondary Gas Pipeline (1050kpa) between Frenchs Forest Road & North Narrabeen to boost the secondary gas system in the Northern Beaches.
Distance: 11 Kilometers
Creek Crossings: 11 Crossings in total
Client: Jemena Asset Management
  • Decommission Existing 375mm Medium Pressure Steel Pipeline
  • Codmah have purchased 3 x Automatic Butt Welding machines Gator 400 G400220AFE for the project, using the Gator 400 instead of the Gator 250 will allow us the flexibility to carryout welds on bends, stub flanges and will also allow us to weld the 400mm PE HDD Casing Pipe.

 

  • Codmah are using a Vermeer 24x40A HDD Rig as the primary insertion technique. The use of the HDD Rig will allow the rods to be inserted up through the pipe section and provide a proven method for attaching and pulling back the PE pipe
  • Codmah is using our Vermeer D100x120A HDD Rig as the primary HDD Equipment for this process. This Drill Rig has  the capabilities to undertake the drilling and pull back of 400mm SDR17.5 PE Casing Pipe in rock for up to 600 meters. Using this HDD Rig allows for the use of mud recycling unit to be placed on site and minimise the amount of waste to be removed to licensed facilities.

 

Munmorah Delivery Pipeline (MDP) - Colongra Lateral Pipeline
Jemena on behalf of Delta Electricity - November 2008 toJanuary 2009
The MDP involved the construction of 320 metres of DN400 9.5WT x42" steel pipe from the Munmorah Delivery Station (MDS) to the Gas Turbines inlet station. The pipeline construction included the 80 metre Screen Bridge Crossing and the installation of electrical and communications conduits - 2 x 125mm PE (elect) & 1 x 63mm PE (comm) lines.

 

Munmorah Offtake Metering Station Pipeline (MOM's) - Colongra Lateral Pipeline

Jemena on behalf of Delta Electricity - December 2008 to January 2009

The MOM's pipeline involved the construction of 76 metres of DN250 12.7mm x42" steel gas pipeline starting at the hot tap fitting on the existing Sydney to Newcastle Pipeline to the inlet of the Munmorah Compressor Station (MCS).

 

Munmorah Gas Feeder Pipeline (MGFP) - Colongra Lateral Pipeline

Jemena on behalf of Delta Electricity - September 2008 to January 2009

The MGFP involved the construction of a 4.0 kilometre DN250 12.7mm x 42" steel gas pipeline starting at the Munmorah Compressor Station (MCS) at the intersection of Bushells Ridge Road & the F3 Freeway to the Interconnect Site adjacent to Wyee Road Wyee NSW.


DN200 Secondary Steel Gas Pipeline - Eastern Suburbs Project

Jemena formerly Alinta - October 2008 to April 2009

The Eastern Suburbs Capacity Development Project is the construction of approximately 2.9km of DN200 diameter secondary pressure (1050KPa) steel gas main. Once completed the new pipeline will provide additional capacity and security for the gas supply to the Eastern Suburbs of Sydney.

DN150 Primary Steel Gas Pipeline Relocation
Laing O'Rourke and Alinta - June 2006 to August 2007

Relocation of DN150 Primary Gas Pipleline for road and bridge works in Albert Ave, Chatswood NSW

 

Sydney Primary Loop

Alinta formerly AgilityJune 2006 to August 2007
Construct 14 kilometres of DN500 Primary Steel Gas Main through residential, commercial and industrial areas of Western Sydney - Casula to Salt Pan Creek.

 

ACT DN250 High Pressure Steel Gas Pipeline

Alinta - June to September 2006

Construct 4.7 kilometres of DN250 Steel Gas Main to reinforce the existing Gungahlin Gas Distribution System along the side of two arterial roadways and two major cycleway crossings.

 

Launceston PE Distribution Gas Main - Stage 2

Powerco and Agility - February 2005 to April 2007

Construction of 122 kilometres of 63, 90, 125, & 160mm PE gas mains by HDD and Open-Cut methods within Launceston Tasmania. This project also involved the installation of industrial, commercial and residential gas services.

 

ACT Gas Reinforcement

Agility - February to May 2003

Construction of 3.5 kilometres of DN150 & DN200 high pressure steel gas mains to reinforce supply for the ACT gas distribution system.

 

ACT Gas Reinforcement 2002 Package B - Agility Team Build

Agility - February to June 2002

Construction of 1.6 kilometres of DN200 secondary steel gas main and S.D.R.S installation in Evatt, Canberra. Construction of 600 metres of DN100 secondary steel gas main and S.D.R.S in Hackett, Canberra.

 

Tumut, Gundagai & Adelong Natural Gas Networks - Country Energy / Agility Team Build

Country Energy and Agility - June 2001 to September 2002

Construction of 20 kilometres of lateral (feeder) mains to Gundagai and Adelong townships and the reticulation of 115 kilometres of 40, 63, 90, 110 and 160mm PE gas mains in Tumut, Gundagai and Adelong.

 

University Avenue (Civic) Canberra - Agility Team Build

Agility - July 2001

Construction of 110mm PE medium pressure gas pipeline by HDD method in Canberra's Civic region.

 

Regents Park Relocation - Agility Team Build

Agility - May to June 2001

Construction of 210 metres of DN350 secondary steel gas main through a residential street and a Sydney Water Board easement. The works involved the relocation, testing, tie-ins and commissioning of the new gas main before cutting, capping and removing the old main while maintaining the gas supply.

 

Blue Mountains Reticulation Project

AGL - 1997 to 2001

Construction of 550 kilometres of gas main reticulation and connection to over 8,500 customers to the AGL Gas Network. The Project also included the construction of 385 kilometres of 50 & 100mm Telstra conduits, the installation of 4,630 P5 and P6 Telstra pits and 1,154 interconnections to existing Telstra plant.

 